Dallas makes trade and general contractors register with the city before they pull permits, and it checks that registration in DallasNow. The city lists registered master electricians, master plumbers, air conditioning contractors and lawn sprinkler contractors as the only people who can pull those trade permits. Dallas also sets construction noise hours and a council franchise for solid waste haulers.
Key takeaways
- Dallas registers contractors in DallasNow, and the system will not issue a permit to an unregistered or expired contractor.
- Electrical contractor registration costs $160 for two years on the city's form and needs $300,000 of general liability insurance.
- A re-roof needs a city permit once labor and materials pass $500.
- Construction next to homes ends at 7 p.m., with a 7 a.m. start on weekdays and 8 a.m. on Saturdays.
- Hauling solid waste for businesses and apartments takes a franchise granted by the Dallas City Council.
Dallas does what many Texas cities do and layers its own registration on top of the state's trade licenses. The details below come from the city's Development Services Department, Sanitation Services, the Dallas City Code as published by the city and the Texas agencies, all as of October 2026. Treat it as general information and not legal advice. Several city forms carry 2024 and 2025 dates, so confirm with Development Services at (214) 948-4480 before you file.
State licenses sit under a Dallas registration layer
The state licenses electricians, air conditioning contractors, plumbers and pesticide applicators, and sets sales tax and workers' compensation rules. Our Texas contractor licenses guide and Texas page cover those. Dallas adds a city registration for each trade, a permit portal and its own codes for noise, wash water and waste hauling. The city's registration forms say the certificate of registration expires when the state license expires, and for plumbers also when the certificate of insurance expires.
DallasNow decides whether you can pull a permit
Dallas runs permits through DallasNow, an online portal. The Development Services guide says contractors and trade professionals must register with the city before pulling permits, and lists registration types for general contractors, electricians, master plumbers, air conditioning contractors, lawn sprinkler contractors, fire alarm and fire sprinkler contractors, backflow contractors, paving contractors and movers, among others. The electrical instructions add that the automated system will not issue a permit to a contractor who is not registered, has an expired registration or whose insurance has expired.
The same guide names who can pull each trade permit:
- Electrical: a registered master electrician. A journeyman cannot pull permits independently.
- Plumbing: a registered master plumber, for pipes, fixtures, water heaters and sewer connections.
- Mechanical: a registered air conditioning contractor.
- Irrigation: a registered lawn sprinkler contractor.
When the trade permit hangs off a primary building permit, the city charges no technology or permit fee on the trade record, but you must type the primary record number exactly. A standalone trade permit carries the standard permit fee and a $15 technology fee, as listed by the city.
Registering with the city, trade by trade
The Development Services office is the Oak Cliff Municipal Center at 320 E. Jefferson Boulevard, open weekdays 7:30 a.m. to 4:30 p.m.
| Registration | What the city form requires |
|---|---|
| Air conditioning, irrigation and other mechanical | License holder appears in person with the completed form, the state pocket license and photo ID. Renewals can be online through DallasNow or in person; a renewal not done in person must be notarized. |
| Plumbing and medical gas | The Responsible Master Plumber appears in person with the form, the state pocket license and photo ID. The city verifies credentials and insurance on the state board's website. |
| Electrical and electrical sign | The master electrician must appear in person, with no faxing, mailing or drop-off. Fee on the form: $160 for the contractor, with a separate master fee, for a two-year registration. Insurance: general liability of at least $300,000 per occurrence, with the city as certificate holder. |
Each form asks for a list of personnel authorized to sign permits for the license holder. The license holder is responsible for keeping that list current, and the all-trades form lists a $30 record change fee for any correction. A company located inside the city limits must give a certificate of occupancy number or confirm that a home office form is on file. The electrical form also asks for proof of business location, which can be a certificate of occupancy, a letter from the municipality of the business, or a state registration certificate showing the address.
When common jobs need a permit
The Development Services guide gives plain answers to several jobs a home service company runs into:
- Re-roofing: a residential roofing permit is required when the total value of materials and labor exceeds $500. The applicant is a registered roofing contractor, or an owner on a verified primary homestead who files a Homeowner's Exemption Affidavit and does the labor personally.
- Windows and doors: like-for-like replacement typically needs no permit if the opening and wall sections do not change. In a historic overlay or conservation district, a Certificate of Appropriateness is required for any exterior change, including like-for-like.
- Decks: a freestanding deck is exempt only if it is 30 inches or less above grade, not over a basement, under 200 square feet and outside the setbacks.
- Retaining walls: four feet or less usually needs no permit unless the wall carries a surcharge. Walls over four feet always need one.
- Pools: in-ground pools and spas always need a pool permit, and the pool electrical work needs its own electrical permit.
The city lists tree mitigation and removal as its own permit type, handled by the City Arborist. The same guide tells customers to verify that a contractor is active in DallasNow for the correct trade and warns against anyone who offers to use the customer's name on a permit. That check is the one your customers are told to make, so keep your registration current.
Construction hours and the noise waiver
Section 30-2(8) of the Dallas City Code limits construction on or next to residential use on weekdays to the hours between 7 a.m. and 7 p.m., and starts an hour later, at 8 a.m., on Saturdays and legal holidays, ending at 7 p.m. The director of transportation may issue a written permit to exceed those hours for urgent public safety needs or other reasons the director finds necessary. The city accepts the waiver application by email at nowrequest@dallas.gov. The city page does not state a fee or lead time.
Hauling waste needs a franchise
Dallas Sanitation Services says a company must hold a franchise to legally provide solid waste collection or hauling in Dallas. The City Council grants the franchises, which are non-exclusive. They cover commercial, industrial and multifamily properties, while the city serves single-family homes and duplexes and private haulers may not serve those locations. The April 2025 supplement to the city code defines solid waste collection as removing wet or dry solid waste from any premises, and lists a defense for an operator that did not run a vehicle more than twice in a calendar year for that purpose. The code sets an impoundment fee of $509 for removing a collection bin to storage and $20 a day for storage. For junk removal, roll-off and dumpster services, read Chapter 18 and ask Sanitation at 214-670-3111 where your service sits.
Wash water and the storm drain
Section 19-118.2 of the Dallas City Code makes it an offense to discharge any water that is not entirely stormwater into the storm drainage system. As quoted in the city's 2012 stormwater management program, the defenses include water used to wash streets, sidewalks, parking lots, driveways or other structures when it is not contaminated with soap, detergent, degreaser, solvent, emulsifier, dispersant or a harmful quantity of another cleaning substance. A pressure washer using detergent on a driveway therefore does not fit that defense. The quoted text is from 2012, so confirm the current wording with the city before you set your wash water practice. State considerations for your work are on the pressure washing start-up guide.
Before you dig
Section 251.151 of the Texas Utilities Code sets a notice window for excavators: a locate request goes in between 14 days and 48 hours before digging, and weekends and legal holidays do not count toward the 48 hours. A Saturday notice allows digging the following Tuesday at 11:59 a.m. unless Monday is a holiday.
Sales tax rate and the North Texas calendar
The Texas Comptroller lists the Dallas local rate at 1 percent, with the Dallas Metropolitan Transit Authority at another 1 percent and a total of 8.25 percent. Taxability of your service is set by the state, and our table summarizes it in our state sales tax table. The National Weather Service's 1991 to 2020 normals for Dallas/Fort Worth show 37.01 inches of precipitation a year, an average of 20 days at or above 100 degrees and 29 freezes a season.
What this means for your site and phones
If you work inside the city limits, put your trade registration on your website so a customer checking DallasNow sees the same company name. Because permits and inspections depend on getting the right person on the line, an AI receptionist that books the inspection window and passes the permit number to your office saves a callback. Review the state's recording rule in our call recording guide before you set up a recorded line.
Frequently asked questions
Do I have to register with the City of Dallas as a contractor?
The Development Services guide says contractors and trade professionals must register with the city before pulling permits. Registration types include general contractor, electrician, master plumber, air conditioning and lawn sprinkler contractor.
What does an electrical contractor registration cost in Dallas?
The city's electrical form lists $160 for a two-year registration, plus a master fee, and requires general liability insurance of at least $300,000. The form is dated May 2024, so confirm the current fee.
Do I need a permit to replace a roof in Dallas?
A residential roofing permit is required when materials and labor exceed $500. A registered roofing contractor applies, or a homesteaded owner who does the labor personally.
Can I work on Sunday in Dallas?
The city page quotes Section 30-2(8) for construction hours near residential use: a later start on Saturdays and legal holidays and a 7 p.m. end every day. The text it quotes does not mention Sundays, so ask the city.
Sources
- Dallas Development Services guide, permits and contractor registration, City of Dallas, 2026
- Electrical Contractor Registration form and requirements (5/15/2024), City of Dallas Development Services
- Contractor Registration form (3/28/2025), City of Dallas Development Services
- Plumbing contractor registration form (5/13/2024), City of Dallas Development Services
- Noise ordinance waiver, quoting Dallas City Code Sec. 30-2(8), City of Dallas
- Authorized private haulers, Dallas Sanitation Services, 2026
- Dallas City Code Volume I, Chapter 18, 4/25 supplement, American Legal Publishing
- Stormwater Management Program Appendix C quoting Dallas City Code Sec. 19-118.2 (April 2012), City of Dallas
- Texas Utilities Code section 251.151 (text read at texas.public.law mirror)
- Local sales and use tax rates by city, Texas Comptroller of Public Accounts
- New Climate Normals (1991-2020), NWS Fort Worth
General information for service-business owners, not legal, tax or financial advice. Rules vary by state; check with a qualified professional for your situation.